Lumber, roof, span and fastener tables

Rafter Span Table

Enter the rafter size, spacing, roof load and pitch to get the maximum horizontal span, the length along the slope and a chart of every size and spacing.

Open on FramingDesk

Embed

Embed this tool

Copy this code into your website, blog or class page. The tool runs inside your page.

Please keep the credit link below the tool.

A rafter span table lists how far a rafter can reach between supports for a given size, wood grade, spacing and roof load. This page works as a rafter span table, rafter span chart and rafter span calculator in one tool: choose the species and grade, size from 2x6 to 2x12, spacing, roof load, dead load, whether a ceiling is attached, and the pitch. It returns the maximum span on the horizontal projection, plus a chart of every size at every spacing. It runs in your browser, is free and needs no sign-up. Results are calculated from your inputs, so they are only as accurate as the loads and assumptions you enter. Use the output to compare sizes before you discuss your own roof with a licensed professional.
Rafter span table example

How to use the Rafter Span Table

  1. Choose the “Species and grade”. The default is Douglas fir-larch No. 2.
  2. Choose the “Rafter size (nominal)”, from 2x6 to 2x12. The default is 2x8.
  3. Choose the “Rafter spacing, on center (in)”: 12, 16, 19.2 or 24. The default is 16.
  4. Set the “Kind of roof load” (roof live load or snow load) and the “Roof live or snow load (psf)”. The presets are 20 psf roof live load, and 30, 40 and 50 psf snow. Pick a snow preset only if it matches your local snow load, which the page does not know.
  5. Set the “Dead load (psf)”. It starts at 10 psf, which suits a light roof with one layer of asphalt shingles. Medium and heavy coverings use 15 and 20 psf in the AWC tables.
  6. Under “Ceiling under the rafters”, say whether a gypsum board ceiling is attached. The default is attached.
  7. Enter the “Roof pitch (rise per 12 in of run)”. The default is 6.
  8. Read the “Maximum span” and the “Length of the rafter along the slope”. With the defaults, the result is 18’-5" horizontal and 20’-7" along the slope, and bending governs.
  9. Check the chart and the warnings. Cells over 26 ft read “over 26 ft”, and any span over 20 ft carries a warning. The structural note under the result says the figures are not a substitute for an engineer, an inspection or a permit.

You can type a different “Live-load deflection limit” if your project needs one.

How far can a rafter span on the horizontal projection?

The span is measured on the horizontal projection, the same way published span tables measure it, and loads are given per square foot of that projection. The page also shows the length along the slope, which is the horizontal span multiplied by the square root of 1 + (pitch/12)². For the default 6:12 roof, that factor is about 1.118, so 18’-5" horizontal becomes 20’-7" along the slope.

The page checks three limits and reports the smallest as the maximum span. Bending uses L = √(8 Fb′ S / w) on live plus dead load, where Fb′ is the adjusted bending value, S is the section modulus and w is the load per foot of rafter. Shear uses L = 4 A Fv′ / (3 w), where A is the cross-sectional area and Fv′ is the adjusted shear value. Live-load deflection uses L = ∛(384 E I / (5 w_live n)), where E is the modulus of elasticity, I is the moment of inertia and n is the deflection limit denominator. The result shows all three limits and which one governs. It gives no pass or fail verdict, and with the default inputs bending governs.

How does the rafter span table set its limits and load durations?

The deflection limit is span/240 with a gypsum board ceiling attached. With no ceiling, it is span/180 when the slope is steeper than 3 in 12. A slope of 3 in 12 or less with no ceiling uses span/240 and shows a warning. Roof live load uses the 7-day value (factor 1.25) of the AWC size-adjusted Fb, and snow uses the 2-month value (factor 1.15). Shear Fv receives the same factor.

The design values come from two sources. Fb comes from AWC Design Values Table W-1. E comes from NDS Supplement Table 4A, because Table W-1 lists 1,200,000 psi for Hem-fir No. 2 in 2x6 and 2x8, while Table 4A lists 1,300,000 psi, the value the published IRC span tables match. Published tables round to the nearest inch, but this page rounds down, so a value can be one inch below the published figure. In a check against 208 cells of IRC R802.4.1(1) to (3), every cell was equal to or one inch below the published value, and none was above.

The calculation assumes a simple span, a uniform load, that rafters are held at the ridge, and that ceiling joists or ties at the bottom of the attic resist the thrust. Higher ties change the spans. It also assumes three or more rafters at 24 in or less, a braced top edge, dry service, and no notches or point loads. Wind and uplift are not checked. The page is not a substitute for an engineer, an inspection or a permit, and the code adopted where you build governs.

Sources (checked 15 October 2026): awc.org · web-media.awc.org · up.codes · cityofsacramento.gov · awc.org · awc.org · web-media.awc.org · up.codes

Worked examples

InputResult
2×8, Douglas fir-larch, No. 2Maximum horizontal span 18'-5", governed by Bending
2×10, Southern pine, No. 2Maximum horizontal span 13'-8", governed by Bending
2×6, Hem-fir, No. 2Maximum horizontal span 14'-5", governed by Deflection under live load (span ÷ 240)
2×12, Spruce-pine-fir, No. 1 / No. 2Maximum horizontal span 17'-5", governed by Bending

Calculated by the tool above; open it with the same values to see each step.

Frequently asked questions

Why is the length along the slope longer than the span I entered?

The horizontal span is the distance across the building, while the slope length is the rafter’s actual length. The page multiplies the horizontal span by the square root of 1 + (pitch/12)² to find it. The span you enter and the maximum span are always on the horizontal projection.

Why does the page show a deflection limit warning?

That warning appears when the slope is 3 in 12 or less and no ceiling is attached. The page then uses span/240 and shows the warning. You can type a different limit if your project calls for one.

Why might my span be one inch shorter than a published table?

Published span tables round to the nearest inch, while this page rounds spans down to the whole inch. A value can therefore sit one inch below the published figure. In the check against IRC R802.4.1(1) to (3), no cell came out above the published value.

What snow load should I use?

The snow presets are 30, 40 and 50 psf, the loads used in the AWC rafter tables. The page does not know your local snow load, so ask your local building department for it and enter the figure that applies to your location.

What do the long span warnings mean?

A span over 20 ft carries a warning, and chart cells over 26 ft read “over 26 ft”. These flags mean the span is long for the size and spacing you chose. Try a larger size or closer spacing in the chart to compare, and read the structural note under the result.

Is the result a final design?

No. The result is calculated from your inputs and the assumptions listed above. It is not a substitute for an engineer, an inspection or a permit, and the code adopted where you build governs. Wind, uplift, notches and point loads are not part of the calculation.